
Dwarka’s Rajapuri–Madhu Vihar road shut for 15 days for RCC work near DJB booster pump; residents report poor signage, diversions, signal failures, traffic jams.

A lane of the Mumbai-Pune Expressway was closed for the Missing Link inauguration arrangements, adding to the heavy traffic flow, with vehicles barely moving in several stretches.